| PROJECT |
Country |
Year |
DELIVERY EXTENT |
Power in kW |
| Toplarna Celje |
SLO
|
2008 |
• CHP plant: 2,1 MWe, 15 MWth • Boiler: 20t/h, 28 bar, 350°C • Waste: RDF + sewage sludge Throughput 30.000 tpa RDF + 5.000 tpa sewage sludge • WID – compliant • Scope: Complete EPC wrap and turn-key project |
18000 |
| Herbos Sisak |
CRO |
2005 |
• Heat only plant: 950kWth (hot water) • Waste: special and medical waste Throughput 1.600 tpa • WID – compliant • Scope: Turn-key technology project |
1100
|
| LEK Mengeš |
SLO |
2004 |
• Plant for thermal oxidation of exhaust air • Gases from organic synthesis production Capacity: 10.000 m3/h • Scope: Turn-key technology project |
2000
|
| Vipap Krško |
SLO |
2003 |
• Steam for technolohy process: 10MW • Fuel: paper sludge, sewage sludge, waste wood Throughput: 55.000 tpa CV: 5-7 MJ/kg • Scope: Fuel handling, primary/secondary Chamber, CMS • Half-WID |
14400
|
| Elan Begunje |
SLO |
2001 |
• Two-stage gasification plant • Steam for technology process: 1 MW • Fuel: plastic from manufacturing Process (polyester, epoxy, polyamide, TPO foils, waste wood, cardboard) CV: 18-22Mj/kg • Scope: Turn-key technology project |
1200
|
KIV Pilot plant Vransko |
SLO |
2000 |
• Two-stage gasification plant for experimental testing of various fuels • District heating: 180kW • Fuel: any solid/liquid fuel Throughput: up to 100kg/h • WID compliant |
200
|
IJS Experimental Plant |
SLO |
1998 |
• Two-stage gasification plant for experimental testing of various fuels • District heating: 180kW • Fuel: any solid/liquid fuel Throughput: up to 100kg/h • WID compliant |
400
|
| Sava Kranj |
SLO |
1995 |
• Plant for thermal oxidation of exhaust air • Gases from vulcanization process with thermal oil heat exchanger Capacity: 5.000m3/h • Scope: Turn-key technology project |
1000
|
FINDLAY Nordhalben |
D |
1995 |
• Two-stage gasification plant
• Steam for technology process: 1MW
• Fuel: plastics from manufacturing process (polyester, epoxy, polyurethane, plastic foils, textile, cardboard) Throughput: 3.000 tpa
• Scope: Turn-key technology project |
2000
|
| Emteks Žalec |
SLO |
1994 |
• Two-stage gasification plant • Hot water for heating: 1,5MW • Fuel: plastics from manufacturing process (polyester, epoxy, jute, textile, cardboard) Throughput: 2.800 tpa • Scope: Turn-key technology project |
1800 |
| Radonja Sisak |
SLO |
1991 |
-cIncineration plant • Hot water for heating: 1,5MW • Fuel: contaminated packaging (cardboard and polyethylene) Throughput: 1.200 tpa • Scope: Turn-key technology project |
600
|
|