Waste to Energy
PROJECT Country Year DELIVERY EXTENT Power in kW
Toplarna Celje SLO
2008 • CHP plant: 2,1 MWe, 15 MWth
• Boiler: 20t/h, 28 bar, 350°C
• Waste: RDF + sewage sludge
Throughput 30.000 tpa RDF +
5.000 tpa sewage sludge
• WID – compliant
• Scope: Complete EPC wrap and turn-key project
18000
Herbos Sisak CRO 2005 • Heat only plant: 950kWth (hot water)
• Waste: special and medical waste
Throughput 1.600 tpa
• WID – compliant
• Scope: Turn-key technology project
1100
LEK Mengeš SLO 2004 • Plant for thermal oxidation of exhaust air
• Gases from organic synthesis production
Capacity: 10.000 m3/h
• Scope: Turn-key technology project
2000
Vipap Krško SLO 2003 • Steam for technolohy process: 10MW
• Fuel: paper sludge, sewage sludge, waste wood
Throughput: 55.000 tpa
CV: 5-7 MJ/kg
• Scope: Fuel handling, primary/secondary
Chamber, CMS
• Half-WID
14400
Elan Begunje SLO 2001 • Two-stage gasification plant
• Steam for technology process: 1 MW
• Fuel: plastic from manufacturing
Process (polyester, epoxy, polyamide,
TPO foils, waste wood, cardboard)
CV: 18-22Mj/kg
• Scope: Turn-key technology project
1200
KIV Pilot plant
Vransko
SLO 2000 • Two-stage gasification plant for
experimental testing of various fuels
• District heating: 180kW
• Fuel: any solid/liquid fuel
Throughput: up to 100kg/h
• WID compliant
200
IJS Experimental
Plant
SLO 1998 • Two-stage gasification plant for
experimental testing of various fuels
• District heating: 180kW
• Fuel: any solid/liquid fuel
Throughput: up to 100kg/h
• WID compliant
400
Sava Kranj SLO 1995 • Plant for thermal oxidation of exhaust air
• Gases from vulcanization process with
thermal oil heat exchanger
Capacity: 5.000m3/h
• Scope: Turn-key technology project
1000
FINDLAY
Nordhalben
D 1995

• Two-stage gasification plant


• Steam for technology process: 1MW


• Fuel: plastics from manufacturing
process (polyester, epoxy, polyurethane,
plastic foils, textile, cardboard)
Throughput: 3.000 tpa


• Scope: Turn-key technology project
2000
Emteks Žalec SLO 1994 • Two-stage gasification plant
• Hot water for heating: 1,5MW
• Fuel: plastics from manufacturing
process (polyester, epoxy, jute, textile,
cardboard)
Throughput: 2.800 tpa
• Scope: Turn-key technology project
1800
Radonja Sisak SLO 1991 -cIncineration plant
• Hot water for heating: 1,5MW
• Fuel: contaminated packaging
(cardboard and polyethylene)
Throughput: 1.200 tpa
• Scope: Turn-key technology project
600
 
/